top of page
Writer's pictureJack Plantz

Week 13 Progress


Goals and Time Estimates:

  • Print final bulb hanging method (~2 hours)

  • Write demo video script (~2 hours)

  • Take photos of fully assembled light (~2 hours)

  • Work on final presentation (~2 hours)

Progress and Actual Time:


The lamp is finally finished! I printed several iterations of the hanging mechanism, before finding fining one that perfectly fits the lamp as well as the bulb fixture. Fortunately the pla of the lamp is flexible enough that it can be inserted through the bottom of the lamp and wedge into the top section. A small amount of superglue is all that is needed to secure it completely.


Now I'm focusing on the final documentation of my project. this involves the final presentation and demo video. I spent most of my time working on the demo video script, as I will likely use. parts of this as a script for my presentation. In the video, I want to highlight the algorithm used to create the light and how it mimics natural processes in a digital environment.


10 views0 comments

Recent Posts

See All

User Testing Interviews

With my final design, I was able to reach out to experts for user testing. I had a great conversation with David Craige, a lighting...

留言


bottom of page